This is the temporary storage for CLIC CDR documents. This webpage contains links to 3 files:
The IEB documents: internal follow-up document for IEB work
The skeleton: The layout of volume 1 (2011) of the CDR as input to the authors
The current CDR draft under review: a regularly updated version of the CDR Volume1 (Last updated 02/05/2012)
PLEASE NOTE: In all 3 documents we use the following convention for the hyperlinks on the left hand side and for the table of contents: If the corresponding item does not contain any text body, the item is written in CAPITAL LETTERS, otherwise the item is written in normal text.
The contributions shown as hyperlinks in the table below point to draft versions if the final version is not yet available. Otherwise, the link points to the final, submitted version.
| Section | Responsible Author | Status | Editor | Comment | |
|---|---|---|---|---|---|
| 1 | Foreword | S. Stapnes | With Copy Editing | NP | 30/03/2012 |
| 2 | The CLIC concept: Key Issues and feasibility | ||||
| 2.1 | Introduction | J.P. Delahaye | third pass IEB | KP | |
| 2.2 | CLIC scheme overview | J.P. Delahaye | third pass IEB | KP | |
| 2.3 | CLIC key issues | J.P. Delahaye | third pass IEB | KP | |
| 2.4 | Explanation of the CLIC two-beam acceleration scheme | G. Geschonke | third pass IEB | KP | |
| 2.5 | Creation of ultra low emittance beams | Y. Papaphilippou | third pass IEB | KP | |
| 2.6 | Highest Luminosity; Preservation of ultra-low emittances | D. Schulte | third pass IEB | KP | |
| 2.7 | Drive Beam generation and Main Beam RF power production | R. Corsini | third pass IEB | KP | |
| 2.8 | X-band RF structures (Accelerating and PETS) | W. Wuensch | third pass IEB | KP | |
| 2.9 | Machine Protection | M. Jonker | third pass IEB | KP | |
| 2.10 | Other critical technology items | H. Schmickler | third pass IEB | KP | |
| 2.11 | Total Power Consumption | B. Jeanneret | third pass IEB | KP | |
| 2.12 | Present level of achievement and outlook for the next years | J.P. Delahaye | third pass IEB | KP | |
| 3 | Accelerator Physics description of the Main Beam complex | ||||
| 3.1 | Injectors | S. Doebert | Final | NP | 13/03/2012; |
| 3.2 | The Damping Rings Complex | Y. Papaphilippou | Back to authors | NP | 28/03/2012; |
| 3.3 | Ring to main linac transport (RTML) | F. Stulle | Back to authors | ||
| 3.4 | Main linacs | D. Schulte | Back to authors | NP | |
| 3.5 | Beam delivery systems | R. Tomas Garcia | Back to authors | NP | 17/02/2012 |
| 3.6 | Machine detector interface | L. Gatignon | Final | 10/02/2012 | |
| 3.7 | Post-collision line | E. Gschwendtner | Back to authors | >NP | |
| 4 | Accelerator Physics description of the Drive Beam complex | ||||
| 4.1 | Drive Beam Accelerators | R. Corsini | Final | >NT | 23/04/2012 |
| 4.2 | Drive Beam Recombination Complex Design | C. Biscari | Final | NT | 23/04/2012 |
| 4.3 | Beam Transport | B. Jeanneret | Final | NT | 23/04/2012 |
| 4.4 | Decelerators | E. Adli | Final | NT | 26/04/2012 |
| 4.5 | Dump Lines | B. Jeanneret | Final | NT | 26/04/2012 |
| 5 | Technical description of the accelerator components | ||||
| 5.1 | Sources | S. Doebert | Final | PL | 13/03/2012 |
| 5.2 | Normal conducting and permanent magnets | M. Modena | Final | PL | 14/03/2012 |
| 5.3 | Superconducting magnets | D. Schoerling | Back to authors | PL | 06/02/2012 |
| 5.4 | Radio Frequency systems | E. Jensen | 2nd Draft Received | ||
| 5.5 | Main Linacs Radio Frequency systems (X-Band) | W. Wuensch | Back to authors | TG | |
| 5.6 | Two-Beam Module | G. Riddone | Back to authors | TG | |
| 5.7 | Vacuum systems | M. Jimenez | With IEB | PL | |
| 5.8 | Powering CLIC | S. Pittet | Final | 22/02/2012 | |
| 5.9 | Beam Instrumentation | T. Lefevre | With IEB | HS | |
| 5.10 | Beam Transfer | M. Barnes | Back to authors | PB | 03/05/2012 |
| 5.11 | Beam intercepting devices | R. Losito | With IEB | ??? | |
| 5.12 | Machine detector interface | L. Gatignon | Final | NP | 15/03/2012 |
| 5.13 | Controls | M. Draper | With IEB | HS | 31/01/2012 |
| 5.14 | Fine Time Generation and Distribution | J. Serrano | Final | TG | 14/03/2012 |
| 5.15 | Real-time Feedback Systems | P. Burrows | With IEB | HS | |
| 5.16 | Machine protection | M. Jonker | Final | TG | 14/03/2012 |
| 5.17 | Active pre-alignment systems | H. Mainaud Durand | With Copy Editing | PL | 02/04/2012 |
| 5.18 | Main Beam quadrupole stabilization equipment | K. Artoos | Back to authors | PB | 17/02/2012 |
| 6 | Civil engineering and technical services | J. Osborne | Final | 08/03/2012 | |
| 7 | CLIC technologies demonstrated in CTF3 | R. Corsini | With IEB | 16/05/2012 | |
| 8 | CLIC Operation at Low Energies | D. Schulte | Back to authors | NP | 16/03/2012 |
| 9 | Staged Construction | ||||
| 9.1 | Motivation and possible scenarios for staged construction | S. Stapnes | With Copy Editing | KP | 05/03/2012 |
| 9.2 | Prelimary design of a 500 GeV accelerator | D. Schulte | With Copy Editing | KP | 02/05/2012 |
| 9.3 | Parameter space for other intermediate energies | D. Schulte | Final | KP | 03/02/2012 |
| 9.4 | Power Consumption with Staged Construction | B. Jeanneret | With Copy Editing | KP | 03/02/2012 |
| 9.5 | Construction Schedules | P. Lebrun | Final | KP | 26/04/2012; |
| 10 | CLIC Parameter Tables | F. Tecker | Final | KP | |
last edit on 16/05/2012 by Hermann