CLIC Conceptual Design Report (CDR)


This is the temporary storage for CLIC CDR documents. This webpage contains links to 3 files:

  1. The IEB documents: internal follow-up document for IEB work

  2. The skeleton: The layout of volume 1 (2011) of the CDR as input to the authors

  3. The current CDR draft under review: a regularly updated version of the CDR Volume1 (Last updated 02/05/2012)

PLEASE NOTE: In all 3 documents we use the following convention for the hyperlinks on the left hand side and for the table of contents: If the corresponding item does not contain any text body, the item is written in CAPITAL LETTERS, otherwise the item is written in normal text.



The contributions shown as hyperlinks in the table below point to draft versions if the final version is not yet available. Otherwise, the link points to the final, submitted version.

> >
   SectionResponsible AuthorStatusEditorComment
1 Foreword S. Stapnes With Copy Editing NP 30/03/2012
 
2 The CLIC concept: Key Issues and feasibility
2.1 Introduction J.P. Delahaye third pass IEB KP  
2.2 CLIC scheme overview J.P. Delahaye third pass IEB KP  
2.3 CLIC key issues J.P. Delahaye third pass IEB KP  
2.4 Explanation of the CLIC two-beam acceleration scheme G. Geschonke third pass IEB KP  
2.5 Creation of ultra low emittance beams Y. Papaphilippou third pass IEB KP  
2.6 Highest Luminosity; Preservation of ultra-low emittances D. Schulte third pass IEB KP  
2.7 Drive Beam generation and Main Beam RF power production R. Corsini third pass IEB KP  
2.8 X-band RF structures (Accelerating and PETS) W. Wuensch third pass IEB KP  
2.9 Machine Protection M. Jonker third pass IEB KP  
2.10 Other critical technology items H. Schmickler third pass IEB KP  
2.11 Total Power Consumption B. Jeanneret third pass IEB KP  
2.12 Present level of achievement and outlook for the next years J.P. Delahaye third pass IEB KP  
 
3 Accelerator Physics description of the Main Beam complex
3.1 Injectors S. Doebert Final NP 13/03/2012;
3.2 The Damping Rings Complex Y. Papaphilippou Back to authors NP 28/03/2012;
3.3 Ring to main linac transport (RTML) F. Stulle Back to authors    
3.4 Main linacs D. Schulte Back to authors NP  
3.5 Beam delivery systems R. Tomas Garcia Back to authors NP 17/02/2012
3.6 Machine detector interface L. Gatignon Final   10/02/2012
3.7 Post-collision line E. Gschwendtner Back to authorsNP  
 
4 Accelerator Physics description of the Drive Beam complex
4.1 Drive Beam Accelerators R. Corsini FinalNT 23/04/2012
4.2 Drive Beam Recombination Complex Design C. Biscari Final NT 23/04/2012
4.3 Beam Transport B. Jeanneret Final NT 23/04/2012
4.4 Decelerators E. Adli Final NT 26/04/2012
4.5 Dump Lines B. Jeanneret Final NT 26/04/2012
 
5 Technical description of the accelerator components
5.1 Sources S. Doebert Final PL 13/03/2012
5.2 Normal conducting and permanent magnets M. Modena Final PL 14/03/2012
5.3 Superconducting magnets D. Schoerling Back to authors PL 06/02/2012
5.4 Radio Frequency systems E. Jensen 2nd Draft Received    
5.5 Main Linacs Radio Frequency systems (X-Band) W. Wuensch Back to authors TG  
5.6 Two-Beam Module G. Riddone Back to authors TG  
5.7 Vacuum systems M. Jimenez With IEB PL  
5.8 Powering CLIC S. Pittet Final   22/02/2012
5.9 Beam Instrumentation T. Lefevre With IEB HS  
5.10 Beam Transfer M. Barnes Back to authors PB 03/05/2012
5.11 Beam intercepting devices R. Losito With IEB ???  
5.12 Machine detector interface L. Gatignon Final NP 15/03/2012
5.13 Controls M. Draper With IEB HS 31/01/2012
5.14 Fine Time Generation and Distribution J. Serrano Final TG 14/03/2012
5.15 Real-time Feedback Systems P. Burrows With IEB HS  
5.16 Machine protection M. Jonker Final TG 14/03/2012
5.17 Active pre-alignment systems H. Mainaud Durand With Copy Editing PL 02/04/2012
5.18 Main Beam quadrupole stabilization equipment K. Artoos Back to authors PB 17/02/2012
 
6 Civil engineering and technical services J. Osborne Final   08/03/2012
 
7 CLIC technologies demonstrated in CTF3 R. Corsini With IEB   16/05/2012
 
8 CLIC Operation at Low Energies D. Schulte Back to authors NP 16/03/2012
 
9 Staged Construction
9.1 Motivation and possible scenarios for staged construction S. Stapnes With Copy Editing KP 05/03/2012
9.2 Prelimary design of a 500 GeV accelerator D. Schulte With Copy Editing KP 02/05/2012
9.3 Parameter space for other intermediate energies D. Schulte Final KP 03/02/2012
9.4 Power Consumption with Staged Construction B. Jeanneret With Copy Editing KP 03/02/2012
9.5 Construction Schedules P. Lebrun Final KP 26/04/2012;
 
10 CLIC Parameter Tables F. Tecker Final KP  


last edit on 16/05/2012 by Hermann